Level 2 · System and Communications Protection

SC.L2-3.13.9

Connections Termination

Network-connection termination should occur at session end or after the defined inactivity period.

Score: 1 POA&M: Eligible
GAVII Cybersecurity assessment reference

Official reference

The requirement

Terminate network connections associated with communications sessions at the end of the sessions or after a defined period of inactivity.

DoD CMMC Assessment Guide, Level 2, version 2.13. SC.L2-3.13.9; requirement and objectives, printed page 229 ↗

Assessment objectives

What must be established

Determine if each applicable objective is satisfied. The labels below follow the cited DoD assessment guide.

  1. [a]

    a period of inactivity to terminate network connections associated with communications sessions is defined;

  2. [b]

    network connections associated with communications sessions are terminated at the end of the sessions; and

  3. [c]

    network connections associated with communications sessions are terminated after the defined period of inactivity.

MET requires evidence that all applicable objectives are satisfied. Final, approved evidence is needed. A NOT APPLICABLE determination needs a scope-based basis and is equivalent to MET for scoring. Enduring exceptions and temporary deficiencies have specific conditions under 32 CFR 170.24; they are not a general permission to defer implementation.

GAVII Cybersecurity assessment approach

Connect the objective to the evidence

Distinguish terminating a connection from locking a user interface. Identify which devices or services enforce the condition and how long-lived connections are handled.

Assessment focus: objectives [a], [b], [c]. Use the methods together; a single example does not establish every objective.

Examine

Inspect connection-timeout definitions, gateway or application settings, and session records.

Interview

Which component closes an idle connection, and how is its timeout chosen and applied?

Demonstrate or test

Use a controlled connection to demonstrate closure at the defined condition and confirm the old connection cannot resume unchanged.

Evidence gaps to look for

  • The workstation locks while the network connection remains open.
  • Documented idle settings are not applied to the relevant service.

GAVII Cybersecurity’s examples illustrate ways to examine, interview, and test. They are not a mandatory artifact list or a guarantee of an assessment result. Combine methods and address every applicable objective in the actual scope.

Assessment constraints

Scoring and POA&M eligibility

Score: 1

If this requirement is NOT MET, deduct 1 point from the Level 2 maximum of 110. The deduction applies to the requirement, not separately to each objective.

Scoring rule ↗

POA&M: Eligible

Potentially eligible only if all Conditional Level 2 criteria are satisfied, including a score of at least 88 out of 110 and timely closeout. Eligibility is not a finding that this requirement is MET.

POA&M rule ↗

Conditional Level 2 requires a score of at least 88 out of 110 and satisfaction of every eligibility condition. A 1-point requirement is not automatically eligible. The permitted POA&M must be closed through the appropriate closeout assessment within 180 days of the Conditional CMMC Status Date. An operational remediation plan does not confer Conditional Status.

Assessment planning

Location and observation

Not specifically listed in CAP P.11

This requirement is not specifically listed in CAP P.11. That does not establish that remote assessment is sufficient: the Lead CCA and C3PAO determine an adequate approach for the actual scope and evidence.

CAP §P.11, pages 10–11 ↗

Check the source

References and related requirements

Program timing and contract applicability can change independently of these requirements. Check current DoD program notices and your solicitation or contract before making a compliance decision. Open the official DoD resource hub.

Get your free consultation.